Sunday, May 17, 2020

Essay Nothing Gold Can Stay by Robert Frost - 1237 Words

I was in seventh grade when I first saw the film The Outsiders. This is when I was first introduced to poetry in a way that stuck with me for the rest of my life. In the film, one of the characters quotes the Robert Frost poem ―Nothing Gold Can Stay.â€â€" I didn‘t really understand the meaning of the poem at the time, but for some reason the poem stayed with me. I had only just heard it and already almost had it memorized. It is a beautiful poem that has a meaning within a meaning and one that seems to make more sense with every new stage of my life. When I first heard the poem, it didn‘t make a lot of sense to me, even though Johnny explains it at the end of the film. Being thirteen years old, I didn‘t really put a lot of†¦show more content†¦I tried and tried, but, in my opinion, nothing I ever wrote seemed worthy enough to share with anyone. Eventually I realized that one of the qualities of the poem that had drawn me to it was its rhythm. Being a drummer, this made perfect sense to me and justified my conclusion as to one of the reasons why I liked Frost‘s poem so much. After graduating high school, I was approached by some friends that had started a rock band, and they asked me to play the drums for them. I had been playing since the age of about twelve. After practice one night, we were all sitting around talking about how we needed more original songs when I had what I thought was an epiphany: ―Song lyrics are just poems put to music!â€â€" I went home that night to write a poem and took it to practice the next night. I was nervous about showing the guys my poem and to save face I called it a ―song,â€â€" but I thought, ―What the hell? All they can do is shoot it down and maybe give me grief over it for the rest of my life, but I‘ve got enough dirt on them now that I can probably shut them up pretty quick.â€â€" They read it one by one, and finally gave it their stamp of approval by saying ―It‘s good, man.â€â€" We put my poem to music, and a ―songâ€â€" was born.7 I started writing more and more. Some of my poems were good, and some were not. Nonetheless, I wasShow MoreRelatedAnalysis Of Nothing Gold Can Stay By Robert Frost742 Words   |  3 Pagespoems story behind it. The title Nothing Gold Can Stay gives us a mood of sadness and loss. The title is not representing a contrast between two things, it is simply giving you an idea of the poems meaning. When you hear Nothing Gold can stay you think of loss and something precious being lost. Repetition in the Poem Even though the poem is rather short and doesnt contain much repetition; the word gold is used frequently because gold is what is symbolizing somethingRead MoreRobert Frost s Poem Nothing Gold Can Stay959 Words   |  4 PagesIn the poem â€Å"Nothing Gold Can Stay† from Robert Frost, corruption first began in nature. The corruption in nature is first seen in the poem when â€Å"†¦ leaf subsides to leaf† and â€Å"†¦dawn goes down to day† (Frost 5, 8). Frost says that nature was once so beautiful but by the conflict in the Garden of Eden it was corrupted. The conflict in the Garden of Eden was caused by corruption in humans. It seems that humans ruin everything good for the sake of themselves. Frost probably wrote this poem while sittingRead MoreLiterary Analysis : Nothing Gold Can Stay By Robert Frost975 Words   |  4 Pages When Robert Frost wrote the poem he had political views because he thought the world was ending. He was also concerned with the way Germany was acting because it was after a huge war. He wrote this poem in the early 1920s the poem was written in english. Frost wrote the poem around the time World War 1 ended and he was fearful about what would happen next. The poem is lyrical because it is short and rhymes. There is a longer verision that has more stanzas. That poem would be a narative becauseRead MoreNothing Gold Can Stay by Robert Frost Illustrates Nothing Lasts Forever604 Words   |  3 Pages â€Å"Nothing Gold Can Stay† is a poem written by Robert Frost in the year 1923. The poem illustrates the fact that nothing will last forever. It especially stresses the fact that money will not last forever, and will soon disappear. Frost makes his point clear throughout the poem by alluding to nature. The entire poem talks about objects in nature that seem beautiful at first, but then subside into nothing. Throughout the poem, Frost uses deep symbolism, rhyme, and allusion to reveal his point. TheRead MoreNothing Gold Can Stay By Robert Frost And The Powwow At The End Of The World `` By Sherman978 Words   |  4 Pagesanalyzed are â€Å"Nothing Gold Can Stay† by Robert Frost and â€Å"The Powwow at the End of the World† by Sherman Alexie. Both of these poems have a common theme that has to do with nature. Although the poems come from authors of two different backgrounds, one is a white American and the other is a Native American. The poems each use legends or myth to get a specific point across. These poems are great examples of myth/legend use to drive its authors point across, such as â€Å"Nature’s first green is gold,† a reflectionRead MoreAnalysis Of Nothing Gold Can Stay1355 Words   |  6 PagesRobert Frost wrote Nothing Gold Can Stay in 1923. Frost wrote this poem out of fear the world would end. He did not publish the entire poem and modified the first section. The first section is what is featured in print. By not publishing the entire piece, this leads me to believe he was going to publish the whole piece for a different reason than the reason he only published part of it. He may have targeted one audience with all of the piece, but then another audience with only part of the pieceRead MoreLiterary Analysis Of Robert Frosts Nothing Gold Can Stay893 Words   |  4 PagesThe author of Nothing Gold Can Stay is Robert Frost. He wrote the poem in 1923. Frost was born March 26, 1874 in San Fransico. His parents were William Prescott Frost and Isabelle Moodie. When he was in high school he started to get intersed in reading and writing poetry. After leaving school, Frosthad jobs as a teacher, a cobbler, and the editor of Lawrence Sentinel. His first poem published was My Butterfly, on Nov. 4th 1894 it appeared in the New York newspaper The Independent. And in 1895Read MoreThe Meaning Of Nothing Gold Can Stay1204 Words   |  5 PagesNothing Gold Can Stay was written by Robert Frost in 1923. Frost was a U.S. citizen. Frost was born in San Francisco, California on March 26, 1874. His father died, so his family moved to Massachusetts. He married his wife, Elinor White, and a year later after they got married had a child, Elliot. Frosts first son died of cholera in 1900. After Elliots death they had four more children. Carol, who committed suicide in 1940, Irma, developed mental illness, Marjorie, died after giving birth to herRead MoreAnalysis Of The Poem Nothing Gold Can Stay1262 Words   |  6 Pagesonce the poem was published the author of the poem Nothing Gold Can Stay was Robert Lee Frost. I think Robert frost based his poem on things he has seen in his life and based it off of nature. the poem was written in 1923. the poem was one of many poems the author robert frost wrote, its own poem but has the same author of multiple poem the main style of this poem is narrative. I think its narrative because the poem tells a story and digs deep into things found in nature. its not focused on a personRead MoreLiterary Analysis Of Robert Frosts Nothing Gold Can Stay970 Words   |  4 PagesRobert Frost wrote this poem in 1923. Frost is referencing creation from a perspective of a Christian. The poem is about creation and how creation evolves overtime. He is American from New England. This piece is from 20th century poetry. The style of Roberts Frosts poem Nothing Gold Can Stay, is a little bit of a confessional poem. I think this because it is maybe reflecting someones memories or experiences from the past about creation. As well as talking about seasons changing. An example

Wednesday, May 6, 2020

Suicide Awareness Essay - 991 Words

Suicide is the 11th leading cause of death among the United States. (Roxanne Dryden-Edwards) By definition homicide is the killing of a human being by another human being, but suicide is the act of killing oneself intentionally. Suicide awareness needs to be raised by knowing what suicide is, teaching others about suicide, and the effects of suicide. Each year in the United States over 300,000 individuals will attempt suicide, with approximately 32,000 taking their own life. (Dana Lizardi) The most common causes of suicide are the breaking up of a romantic relationship, moving, loss (especially if by suicide) of a friend, loss of freedom, or the loss of other privileges. Normally when people hear that someone has committed suicide they†¦show more content†¦One method used by some individuals is by threatening police officers, sometimes even with an unloaded gun or a fake weapon. That is commonly referred to as suicide by cop. Firearms are by far the most common methods by wh ich people take their life, accounting for nearly 60% of suicide deaths per year. (Kendall Harmon) If the United States reduces the number of firearm ownership the overall suicide rate would decrease 2.5%, or about 800 fewer deaths per year. (Kendall Harmon) When a friend states that he or she wishes they could just die; take them seriously. Many reported suicide cases state that the suicide victim told the peers, but the peers didn’t realize their cry for help. If a friend going through a tough time in their life the best protective factors would be to listen, care, and make sure they have a strong social support system. An effective treatment for suicide is different types of therapy. There are three types of therapy: group, cognitive, and behavioral. The most common therapy for suicidal cases is group. This not only allows the person to interact with others who have the same problem as they do, but it also allows the person to create new friends. It also makes it easier f or them to open up. For example, a middle-aged guy only went to 5 group therapy sessions after attempting suicide, and to this day he has not attempted taking his own life again. (Dana Lizardi) Coping with the loss of a loved one do to suicide maybe the most difficult thingShow MoreRelatedA Research On Suicide Awareness Programs1456 Words   |  6 PagesSuicide-Awareness Programs Taylor Dixon Methodist College N342 Suicide-Awareness Programs In the nursing field, there are several nursing interventions that exist. Suicide-awareness programs are a specific nursing intervention that could be used in a specific situation. For a nursing intervention to be effective, it must be proven through scientific research, making the intervention evidence-based practice. The purpose of this assignment is to utilize and evaluate evidence-basedRead MoreThe Suicide Prevention Awareness Clinic Essay1501 Words   |  7 PagesSuicide is still a major public health problem in the United States today. The Centers for Disease Control and Prevention (CDC) documents several disturbing statistics on suicide in America. The most significant one being that suicide is the eleventh leading cause of death in the United States across all age groups. (D’Orio, 2004) What most people don’t understand is that people who commit suicide are suffering from some sort of mental illness. Most people often see mental illness as a characterRead More Mental Health Care And Suicide Awareness1264 Words   |  6 Pagespaper is meant to explore the occurrence of suicide in the context of its causes and the effects it has on adolescents. Generally, the literature reviewed revealed a strong connection between economics and mental illness as the two relate to causes of suicidal ideation. More simply, there is evidence that as a person’s economic standing reduces, he or she is more prone to mental illness which can expose them to suicidal risk and behavior. Additionally, suicides especially those which occur in areas withRead MoreSpreading Awareness About Elderly Suicide956 Words   |  4 PagesSpreading awareness about elderly suicide is important because society should not turn a blind eye on the issue just because they are old. There is a huge disparity between what people feel towards suicides in relation to age. First of all, people believe that being old is a negative aspect so suicide can be a rational thought. On the ot her hand, people are disheartened when younger people end their lives because they feel that they have more to lose As a matter of fact, rational suicide is a termRead MoreMental Illness Awareness And Suicide Prevention825 Words   |  4 PagesGovernment and Politics course this year, and have learned quite a bit about public policy. I would like to discuss with you about Mental Illness Awareness and Suicide Prevention. This topic is quite dear to me, as I myself suffer with a mental illness. I feel that this is a extremely crucial time to address and act upon this issue, as it is coincedently mental awareness week and month. I understand the hesitancy towards mental illness, it is a sensitive topic, and haven’t told many about my mental illnessRead MoreCyberbullying And Its Effect On Society1254 Words   |  6 Pagesof a peer and spread it around through online social media, causing people to make fun of that person, or even bully them more, and overall resulting in signif icant negative effects on their daily life and reputation, and sometimes, in rare cases, suicide. While cyberbullying is less frequent than traditional bullying,3 it is still a major issue for people worldwide, especially youth. Studies have shown that over half of school students are bully victims, and about one in four are cyberbully victimsRead MoreCounseling993 Words   |  4 Pagescounselors. The personal qualities of effective counselors are self-awareness, interpersonal awareness, objectivity and personal integrity, open-minded and trustworthy. Self-awareness is a term utilized to describe the counselor’s understanding and acceptance of his feelings, attitudes, and values. It is the recognition and acceptance of his personal awareness and the impact in others. Interpersonal awareness, objectivity, and personal integrity refer to the counselor ability to understandRead MoreWhat significance do journeys have in The Kite Runner as a whole?820 Words   |  4 Pagesjourney in search of a final resting place. Amirs journeys are also linked with traumatic effects with each of his journeys being linked to major events. For example Amirs journey to Pakistan in the truck leads to the death of Kamal and the suicide of his father which has a profound effect on Amir as he realizes the true impact of the rape and how his reluctance to act is probably effecting Hassan in the same way as it had effected Kamal. His journey in the fuel tanker with Kamal is also relevantRead MoreSuicide Is A Serious Issue1679 Words   |  7 PagesSuicide is one of the largest social problems today affecting many lives in one way or another. It is a serious issue with multiple contributors that have been elusive in many cases as we try to understand why many younger people are choosing to end their lives instead of receive the help they need. Suicide is a serious issue that can have lasting results on individuals, families and communities. Although suicide rates decreased from 1990-2000, suicide is on the rise again a nd now the â€Å"10th leadingRead MoreThe Consequences of Adolescent Suicide1241 Words   |  5 PagesThe act of suicide is an event that has been woven in to the fabric of our culture since our country’s inception. In order to conceptualize and define the problem of suicide, it is important to examine the various views of taking one’s own life. Suicide, and its tragic aftermath, has been the source of award winning movies such as Ordinary People and Leaving Las Vegas, along with the public debate, regarding assisted euthanasia, spotlighted in the case of Dr. Jack Kevorkian. Reports of skyrocketing

Application of System Dynamics †Free Samples to Students

Question: Discuss about the Application of System Dynamics. Answer: Introduction: The health department system works with various doctors, nurses and staffs working for providing healthcare services and advices to the customer. The increase in the number of patients and frequency of services has made the services more complex and critical to accommodate in the existing location. Due to the smaller size of the exiting location, the healthcare services were not able to provide efficiently treatments to the increased patient base. The waiting time of the patients has increased significantly. Therefore, moving to a new location with greater space would allow the healthcare services department to hire and accommodate more employees for treating more patients within less time. The project revolves around the relocation of the staffs and health information service department to a new location. Therefore, the relocation of the health information services relocated the services, information system, personnel to a new location for enhancing the effectiveness of the health i nformation services. Stakeholders are identified as the group of persons that are directly or indirectly involved with the relocation of the healthcare information service department to a new location. In this project, the major stakeholders includes the authorities of healthcare department, the patients, doctors, nurses, project manager, architect, interior designer, staffs, and electricians. The Responsibility Matrix WBS Activity Name authorities of healthcare department project manager architect interior designer staffs electricians 1 start project 2 project initiation phase 2.1 meeting with the client A R 2.2 identify the relocation requirement A R 2.3 project charter 2.3.1 develop project charter R 2.3.2 obtain approval of the client A R 3 project planning phase 3.1 develop planning for relocating the department I R C 3.2 develop the project budget I R 3.3 develop plan for completing the relocation I R C I 3.4 procure the project A R 3.5 new location plan 3.5.1 determine the patient base A R 3.5.2 identify the physical structure of the new site C R 3.5.3 select new office location 3.5.4 lease the new location A R 3.5.5 obtain agreement A R 3.5.6 develop architectural design C R 4 project execution phase 4.1 develop the architectural module 4.1.1 develop space for office C R 4.1.2 cubicles C R 4.1.3 receptions C R 4.1.4 medical rooms C R 4.2 complete interior design C R 4.3 include medical equipment C I R 4.4 implement cabling C C I R 4.5 electrical services C C I R 4.6 telephone services C C I R 4.7 packing from the existing location I C R 4.8 unpacking to the new location I C R 4.9 finalize the relocation date C R I I I I 5 project closure phase 5.1 inform the employees R 5.2 inform the customers R 5.3 open the new location of the health department A R 5.4 sign off of the team members C R 6 stop project R In the above table, R = Responsible, A = Accountable, C = Consulted, I = Informed For the relocation of the healthcare information service department, the cost, quality, scope and time has been considered as the major constraints. The relocation of the department needs to ensure all the scope has been completed within the allocated time and budget while ensuring the quality and standard of the project. The following are the assumptions developed for the relocation of the health information service department are illustrated in the section below: The relocation of the department needs to completed within the allocated time of 2.5 months; The data from the existing location of the department has already been backed up by the employees; The healthcare authorities have provided with the financial amount required for the relocation of the department to the new location; Communication Plan Who What Why When How Authorities Of Healthcare Department Approving and reviewing the project plan and relocation. Modification in the plan regarding the budget and schedule Once a week Formal meeting Project Manager Developing the project budget, schedule, cost and managing the progress. Issues faced during the relocation of the department Whenever required Verbal communication, meetings emails and telephone Architect Developing the renovation plan and architecture of the new location. Changes or modification of the architectural design of the new location. Whenever required Verbal communication, meetings emails and telephone Interior Designer Developing the design for the rooms, cubicles and interior design of the new location. Changes or issue faced regarding the developer of the interior design. During the implementation phase Verbal communication, meetings emails and telephone Staffs Carrying out the relocation staffs and completing the relocation. For informing about any changes required during the project. Once a day Verbal communication, and meetings Electricians Providing the electrical connection and telephonic line in the new building location. Informing about any modification and changes made in the plan. Whenever required Verbal communication, meetings and telephone For measuring the success of the relocation of the health information service department, the following criteria need to be measured and obtained: The opening of the new location has been done on the scheduled data; The project has successfully relocated the medical equipments from the existing location to the new one; The relocation of the project has been completed within the allocated time and budget provided; A Breakdown of the Activity (WBS) WBS Task Name Start Date End Date Resource Duration Dependencies 1 start project 08/21/17 08/21/17 0 2 project initiation phase 08/21/17 08/28/17 6d 2.1 meeting with the client 08/21/17 08/21/17 Project Manager 1d 1 2.2 identify the relocation requirement 08/22/17 08/23/17 Project Manager 2d 3 2.3 project charter 08/24/17 08/28/17 3d 2.3.1 develop project charter 08/24/17 08/25/17 Project Manager 2d 4 2.3.2 obtain approval of the client 08/28/17 08/28/17 Project Manager 1d 6 3 project planning phase 08/29/17 09/14/17 13d 3.1 develop planning for relocating the department 08/29/17 08/31/17 Project Manager 3d 7 3.2 develop the project budget 08/29/17 08/29/17 Project Manager 1d 7 3.3 develop plan for completing the relocation 08/29/17 09/01/17 Project Manager 4d 7 3.4 procure the project 09/04/17 09/04/17 Project Manager 1d 9, 10, 11 3.5 new location plan 09/05/17 09/14/17 8d 3.5.1 determine the patient base 09/05/17 09/05/17 Project Manager 1d 12 3.5.2 identify the physical structure of the new site 09/05/17 09/06/17 architect 2d 12 3.5.3 select new office location 09/07/17 09/11/17 3d 3.5.4 lease the new location 09/07/17 09/08/17 Project Manager 2d 14, 15 3.5.5 obtain agreement 09/11/17 09/11/17 Project Manager 1d 17 3.5.6 develop architectural design 09/12/17 09/14/17 architect 3d 18 4 project execution phase 09/15/17 10/23/17 27d 4.1 develop the architectural module 09/15/17 09/27/17 9d 4.1.1 develop space for office 09/15/17 09/25/17 architect 7d 19 4.1.2 cubicles 09/15/17 09/20/17 architect 4d 19 4.1.3 receptions 09/15/17 09/21/17 architect 5d 19 4.1.4 medical rooms 09/15/17 09/27/17 architect 9d 19 4.2 complete interior design 09/28/17 10/05/17 interior designer 6d 22, 23, 24, 25 4.3 include medical equipment 10/06/17 10/10/17 staffs 3d 26 4.4 implement cabling 10/11/17 10/12/17 Electricians 2d 27 4.5 electrical services 10/11/17 10/13/17 Electricians 3d 27 4.6 telephone services 10/11/17 10/11/17 Electricians 1d 27 4.7 packing from the existing location 10/16/17 10/17/17 staffs 2d 28, 29, 30 4.8 unpacking to the new location 10/18/17 10/20/17 staffs 3d 31 4.9 finalize the relocation date 10/23/17 10/23/17 Project Manager 1d 32 5 project closure phase 10/24/17 10/26/17 3d 5.1 inform the employees 10/24/17 10/24/17 Project Manager 1d 33 5.2 inform the customers 10/24/17 10/24/17 Project Manager 1d 33 5.3 open the new location of the health department 10/25/17 10/25/17 Project Manager 1d 35, 36 5.4 sign off of the team members 10/26/17 10/26/17 Project Manager 1d 37 6 stop project 10/26/17 10/26/17 Project Manager 0 38 Identify the Project Objectives The objectives of the relocation project are: To select an appropriate location for relocating the existing health information service department; To efficiently relocate the department to a new location; To select an appropriate location for relocating the health information services department; To select an appropriate date for opening the new date for reopening the health information system; To provide complete interior design of the new location; To inform the employees and customer about the new location of health information service department; To ensure packing and unpacking of the devices, equipments and other hardware from the existing location to the new location; The out-scope of the project includes: The transportation of the employees from the existing location to the new location is not included within the project; To clean up the existing departmental location is also out of scope of the project; List all Critical Project Deliverables The critical deliverables of the relocation of the health information service department includes the following: WBS Task Name 2 project initiation phase 2.1 meeting with the client 2.3 project charter 2.3.1 develop project charter 3.2 develop the project budget 3.4 procure the project 3.5.2 identify the physical structure of the new site 3.5.4 lease the new location 3.5.5 obtain agreement 3.5.6 develop architectural design 4.1.4 medical rooms 4.2 complete interior design 4.3 include medical equipment 4.5 electrical services 4.7 packing from the existing location 4.8 unpacking to the new location 4.9 finalize the relocation date 5.1 inform the employees 5.2 inform the customers 5.3 open the new location of the health department 5.4 sign off of the team members Risk Management Plan Risk Profile: In this section the potential risks that could occur during the project are identified and illustrated in the section below: Deadline Risk: The relocation of the department has been delayed due to unavailability of appropriate location for shifting. Budget Risk: The relocation activities and the selection of the appropriate new location for the department have exceeded the budget allocated by the authorities. Quality Risk: The relocation activities failed to relocate the hardware and medical element from the existing location to the new locations. In addition to that, the new location fails to provide detailed space required for health information service department. Personnel Risk: The staffs or electricians fail to work in the project due to significant health issues. This has delayed the recollection project. Security Issues: During the relocation of the all the files, documents and computers from the existing location to the new locations, the files and patients information were lost and misplaced. Risk Id Risk Risk Impact Likelihood of Risk Reference cell R1 Deadline Risk Lost Time Likely C3 R2 Budget Risk Major Moderate B4 R3 Quality Risk Major Unlikely A4 R4 Personnel Risk Trivial Moderate B1 R5 Security Issues Major Moderate B4 Mechanism of Risk Control: The contingency plan developed for each of the identified risk for the relocation of the healthcare information service department is illustrated in the section below: Deadline Risk: The project manager and the authorities of thee healthcare information service department needs to conduct a preliminary study about the location that would be most suitable for relocation. Budget Risk: The project manager needs to review the plan and concern with the healthcare authorizes before approving the location and leasing the selected new location with high budget. Quality Risk: The project manager needs to review the existing department and evaluate the operation followed by the healthcare information service department. In addition to that, the project plan should be reviewed and approved the authorities of the department for ensuring the quality. Personnel Risk: Before hiring the personnel for the relocation to the new location, the project manager needs to ensure the availability of the personnel during the required work for the project. Security Issue: The project manager needs to recover all the files and reenter all the medial information of the patients for the database and computers installed in the new location. The control strategy for the identified risks has been illustrated in the section below: Deadline Risk: The remaining activities need to be rescheduled within the remaining time for completing the relocation within allocated time. Budget Risk: The remaining activities for the relocation need to be developed within the remaining budget for the project. Quality Risk: The project manager needs to change and modify the plan, interior design and architecture of the new location based on the requirement of the department. Personnel Risk: The project manager needs to hire new personnel for ensuring the progress of the relocation project and to complete the project within deadline. Security Risks: The project manager and the authorities of the healthcare organization need to inform the employees to back up their personal data from the computers. Further before packing up the data from the existing location, high caution needs to be taken while backing up the database. Risk Management Template Risk Id Risk Risk Impact Likelihood of Risk Severity of Consequences Level of Risk Mitigation Contingency Plan Risk Owner Date Logged Date of review R1 Deadline Risk: The relocation of the department has been delayed due to unavailability of appropriate location for shifting. Lost Time Likely High Medium The remaining activities need to be rescheduled within the remaining time for completing the relocation within allocated time. The project manager and the authorities of thee healthcare information service department needs to conduct a preliminary study about the location that would be most suitable for relocation. Project Manager 9/7/2017 9/08/2017 R2 Budget Risk: The relocation activities and the selection of the appropriate new location for the department have exceeded the budget allocated by the authorities. Major Moderate High Medium The remaining activities for the relocation need to be developed within the remaining budget for the project. The project manager needs to review the plan and concern with the healthcare authorizes before approving the location and leasing the selected new location with high budget. Project Manager 9/12/2017 9/13/2017 R3 Quality Risk: The relocation activities failed to relocate the hardware and medical element from the existing location to the new locations. In addition to that, the new location fails to provide detailed space required for health information service department. Major Unlikely Low Low The project manager needs to change and modify the plan, interior design and architecture of the new location based on the requirement of the department. The project manager needs to review the existing department and evaluate the operation followed by the healthcare information service department. In addition to that, the project plan should be reviewed and approved the authorities of the department for ensuring the quality. Project Manager 9/15/2017 9/15/2017 R4 Personnel Risk: The staffs or electricians fail to work in the project due to significant health issues. This has delayed the recollection project. Trivial Moderate Low Low The project manager needs to hire new personnel for ensuring the progress of the relocation project and to complete the project within deadline. Before hiring the personnel for the relocation to the new location, the project manager needs to ensure the availability of the personnel during the required work for the project. Project Manager 9/25/2017 9/26/2017 R5 Security Issues: During the relocation of the all the files, documents and computers from the existing location to the new locations, the files and patients information were lost and misplaced. Major Moderate High High The project manager needs to recover all the files and reenter all the medial information of the patients for the database and computers installed in the new location. The project manager and the authorities of the healthcare organization need to inform the employees to back up their personal data from the computers. Further before packing up the data from the existing location, high caution needs to be taken while backing up the database. Project Manager 10/12/2017 10/12/2017 Bibliography Bourdeau, S. and Barki, H., 2013. Toward a typological theory of information system project team management styles. In8th Pre-ICIS International Research Workshop on Information Technology Project Management (IRWITPM 2013)(p. 125). Bresnen, M., 2016. Institutional development, divergence and change in the discipline of project management.International journal of project management,34(2), pp.328-338. Chen, F., Nunamaker, J.F., Briggs, R.O., Corbitt, G., Sager, J. and Gardiner, S.C., 2014. An application of focus theory to project management processes.Group Decision and Negotiation,23(5), p.961. Conforto, E.C., Amaral, D.C., da Silva, S.L., Di Felippo, A. and Kamikawachi, D.S.L., 2016. The agility construct on project management theory.International Journal of Project Management,34(4), pp.660-674. Eskerod, P., Huemann, M. and Ringhofer, C., 2015. Stakeholder inclusiveness: Enriching project management with general stakeholder theory.Project Management Journal,46(6), pp.42-53. Flyvbjerg, B., 2013. Quality control and due diligence in project management: Getting decisions right by taking the outside view. International Journal of Project Management, 31(5), pp.760-774. Ford, D.N. and Lyneis, J.M., 2013. The Application of System Dynamics to Project ManagementIntroduction to the Virtual Issue of System Dynamics Review. Kerzner, H., 2013.Project management: a systems approach to planning, scheduling, and controlling. John Wiley Sons. Larson, E.W. and Gray, C., 2013.Project Management: The Managerial Process with MS Project. McGraw-Hill. Leach, L.P., 2014.Critical chain project management. Artech House. Martinsuo, M., 2013. Project portfolio management in practice and in context.International Journal of Project Management,31(6), pp.794-803. Midler, C., Killen, C.P. and Kock, A., 2016. Project and Innovation Management: Bridging Contemporary Trends in Theory and Practice.Project Management Journal,47(2), pp.3-7. Niknazar, P. and Bourgault, M., 2017. Theories for classification vs. classification as theory: Implications of classification and typology for the development of project management theories.International Journal of Project Management,35(2), pp.191-203. Pitsis, T.S., Sankaran, S., Gudergan, S. and Clegg, S.R., 2014. Governing projects under complexity: theory and practice in project management.International Journal of Project Management,32(8), pp.1285-1290. Riol, H. and Thuillier, D., 2015. Project management for academic research projects: balancing sRisk Management Templatetructure and flexibility.International Journal of Project Organisation and Management,7(3), pp.251-269. Sderlund, J. and Mller, R., 2014. Project management and organization theory: IRNOP Meets PMJ.Project Management Journal,45(4), pp.2-6. Staley, M., 2016. Advancing the Theory and Practice of Engineering Project Management by addressing the issue of CPI Stability and Hidden Project Performance. Svejvig, P. and Andersen, P., 2015. Rethinking project management: A structured literature review with a critical look at the brave new world.International Journal of Project Management,33(2), pp.278-290. Todorovi?, M.L., Petrovi?, D.?., Mihi?, M.M., Obradovi?, V.L. and Bushuyev, S.D., 2015. Project success analysis framework: A knowledge-based approach in project management.International Journal of Project Management,33(4), pp.772-783. Too, E.G. and Weaver, P., 2014. The management of project management: A conceptual framework for project governance.International Journal of Project Management,32(8), pp.1382-1394. Turner, R., 2016.Gower handbook of project management. Routledge. Verzuh, E., 2015.The fast forward MBA in project management. John Wiley Sons.